ISC FCE Management Platform Evaluation MVP Sign in

Guided evaluation

Ten steps, in the order the work actually happens. Each one says why it matters, which role to be, what to do, what you should see, and which requirement it demonstrates.

Step 3 of 10

J3. Submission into the ISC review

Why this step matters
Show the submission deadline, the blocked window and the late bid rule working as real behaviour rather than as labels.
Act as
ISC 1st Vice President
What to do
Set the simulated date on the workspace screen, then try to submit a bid before 1 November, inside the blocked window, and after 7 December.
What you should see
Submission is open, refused, then accepted as a late bid needing a two thirds majority. Reviewers are assigned and the review clock starts.
Requirement demonstrated
Bid FRS FR-007, FR-008 and FR-015: the submission window, the blocked period and reviewer assignment.

Sign in to walk this step. The tour links below go to the real screens, not to a demonstration copy of them.

Go to Reviews and actions The simulated date

All ten steps

Every link above goes to the working screen, not to a mock of it. If a screen refuses you, that is the server applying the permission model, and it is a result worth recording.